Промпт для ИИ: Прибрежный базальтовый павильон, построенный в таймлапсе
Coastal basalt pavilion built in time lapse
Пять зафиксированных кадров, соединенных резкими переходами, каждый с уникальной позицией камеры, плюс список неизменных фактов о строительстве (открытие крыши, сетка колонн, размещение камня и стекла), чтобы структура оставалась последовательной на протяжении всего процесса. В конце происходит медленный отъезд и подъем без затухания, что придает клипу четкое завершение.

Промпт: Прибрежный базальтовый павильон, построенный в таймлапсе
Готовый промпт на основном языке: Coastal basalt pavilion built in time lapse prompt.
Generate a hyper-realistic architectural construction time-lapse short film, approximately 10 seconds long, in 9:16 vertical screen format, with compressed time-lapse footage. The scene is set on a rugged black basalt coastline, surrounded by gray-blue seawater, with the horizon positioned near the one-third mark from the top of the frame. Use a high three-quarter overhead shot, with the building always located in the lower-middle section of the frame. The entire film must maintain the same compact single-story rectangular coastal pavilion: fixed aspect ratio, heavy flat cantilevered roof, with only one regular square opening in the center of the roof, supported by four dark charcoal gray steel columns at the corners, featuring black thin-framed floor-to-ceiling glass on the front and right sides, a full irregular gray basalt stone wall on the left side, a light gray concrete platform, narrow encircling walkway, and thin black metal railings. During construction, do not alter the building's number of stories, orientation, roof outline, opening position, column grid, or the relationship between the stone wall and glass walls. 0.00–1.38 seconds: Under a cold gray overcast sky, a yellow tracked bulldozer moves back and forth rapidly within a rectangular plot surrounded by volcanic rock, with its blade continuously contacting the ground to level the soil, kicking up brief, natural dust clouds. The high-angle shot remains mostly locked, with only very slight stabilizing drift. Hard cut. 1.38–2.71 seconds: A concrete mixer truck pours wet concrete through a chute into the square formwork and rebar mesh, with the concrete spreading from the center outward. Workers wearing hard hats and high-visibility vests use long-handled tools to quickly level the foundation. The formwork, vehicles, and coastal environment remain stable. Hard cut. 2.71–5.25 seconds: On the same foundation, perform high-speed but clearly readable steel structure construction. Components are installed in the sequence of "column bases, vertical steel columns, outer ring beams, roof grid, black-framed glass, roof panels." The crane hook descends from above the frame, with steel members positioned only at reasonable structural connection points. The thick flat roof is completed piece by piece, while always preserving the central square roof opening. The sky gradually shifts from cold gray to soft warm orange, with a subtle AI-like growth-style time compression feel, but the building geometry remains hard-edged and stable. Hard cut. 5.25–6.21 seconds: Switch to a closer side elevation medium shot. Workers install irregular gray basalt stone blocks row by row from the bottom of the wall upward, while completing the light gray ground paving, glass doors and windows, and facade finishing. Stone material can only appear in the designated solid wall area and must not cover the glass. The shot has only slight stabilizing drift. Hard cut. 6.21–10.04 seconds: Switch to an exterior view of the completed building. Construction personnel and equipment quickly clear the site, with warm yellow interior lights, stone wall sconces, and small pathway lights illuminating in sequence. The camera steadily pulls back and slowly rises, gradually revealing the complete modern pavilion, black volcanic rock, nearshore waves, distant bay, and orange-pink sunset glow. The glass subtly reflects the twilight, with rough stone walls and damp rock details sharp and clear, and seawater flowing slowly. The final camera movement remains in a gentle pull-back and rise state, ending naturally without fade-out or freeze-frame. Overall, present a hyper-realistic architectural visualization, a healing coastal atmosphere, and a controlled AI construction time-lapse texture. Materials are authentic, lighting is restrained, and spatial relationships are stable. Transitions between the five shots use only direct hard cuts, without dissolves, flash whites, or distortion transitions. No subtitles, no logos, no UI elements, no watermarks.
Как создать фото с промптом «Прибрежный базальтовый павильон, построенный в таймлапсе»
Три шага до идеального промта:
Скопируйте промпт
Нажмите «Скопировать промпт» — текст попадёт в буфер обмена.
Откройте приложение
Откройте интсрумент «Создать по своему промпту», нажмите «Сгенерировать» и при необходимости загрузите своё фото.
Получите результат
Выберите модель, подождите пару секунд и скачайте готовое изображение.
Еще из категории «Кино»
Подобрали промпты с похожими стилями, сценами и сюжетами
Попробуйте наши уникальные образы
Готовые ИИ-фотосессии с вашим лицом в один клик — без сложных настроек и копирования промптов
Соберите свою фотосессию
Создайте аккаунт, загрузите селфи — и получите первые образы без лишних настроек.







